Epoxy Garage Floor is a service offered by Epoxy Floor Wichita in Wichita, Kansas. An epoxy garage floor is a durable, high-performance flooring system created by applying multiple layers of epoxy resin to a concrete garage slab. This specialized coating provides a seamless, non-porous, and visually appealing surface that is resistant to stains, chemicals, abrasions, and impact. Its importance lies in its ability to transform a standard concrete garage into a clean, professional-looking, and highly functional space. Beyond aesthetics, epoxy garage floors offer enhanced safety due to their anti-slip properties (when aggregates are added), protect the underlying concrete from damage, and simplify maintenance, making them an ideal solution for both residential and commercial garages.
FREE INSTANT QUOTE!
*plus FREE bonus coupon*
*
Indicates required field
What are the projects Epoxy Floor Wichita finalized successfully in Wichita.
The projects Epoxy Floor Wichita finalized successfully in Wichita are mentioned below.
Residential Garage Transformation in East Wichita
We first got called by a retired engineer in East Wichita on May 12, 2025. He was looking for a solution to his oil-stained and deteriorating concrete garage floor, which had developed several cracks and was becoming increasingly difficult to clean. He desired a durable, easy-to-maintain, and aesthetically pleasing floor for his two-car garage.
After our initial consultation, we decided that a full flake epoxy system would best meet his needs, offering both superior durability and a visually appealing finish. On May 14, 2025, our team arrived at his residence, located near the intersection of 13th Street N and Webb Road, close to the Bradley Fair shopping center. We began by meticulously measuring the garage, which had dimensions of 20 feet by 22 feet, totaling 440 square feet. The initial preparation involved grinding the concrete surface using a diamond grinder to remove existing contaminants and create a profile for optimal adhesion. We specifically focused on opening up the hairline cracks, which were about 1/16th of an inch wide, and filled them with an epoxy crack filler. This prep work took approximately 6 hours on the first day.
The next day, May 15, 2025, we applied the first layer of our moisture-mitigating epoxy primer. This crucial step ensures proper adhesion and prevents issues related to moisture vapor transmission from the concrete. This layer cured for 18 hours. On May 16, 2025, we applied the colored epoxy base coat in a dark gray hue, followed immediately by broadcasting the decorative vinyl flakes to full refusal. This process took about 5 hours. The flakes were allowed to cure for 24 hours. On May 17, 2025, we scraped and vacuumed excess flakes, then applied two coats of a high-solids, UV-stable polyaspartic clear coat for maximum protection and gloss. Each polyaspartic coat took about 2 hours to apply, with a 4-hour re-coat window between coats. The entire project, from surface preparation to final clear coat application, took 4 days. The client was able to walk on the floor after 24 hours and resume normal vehicle traffic after 72 hours.
The client was thrilled with the outcome. He remarked, “Epoxy Floor Wichita did an outstanding job! My garage looks like a showroom now. The stains are gone, and it’s incredibly easy to clean. I wish I had done this years ago.”
Commercial Workshop Floor in South Wichita
On May 20, 2025, we received a call from a small auto repair shop owner in South Wichita. Their 1,500 square foot workshop floor, located near the Wichita Mid-Continent Airport off South Airport Road, was severely oil-stained, pitted, and covered in tire marks, making it look unprofessional and challenging to maintain. The owner needed a durable, chemical-resistant, and easy-to-clean flooring solution that could withstand heavy vehicle traffic and constant spills.
We recommended a 100% solids epoxy system with a broadcast quartz aggregate for enhanced slip resistance and extreme durability. Our team arrived on May 22, 2025, for the site assessment and measurements, confirming the 1,500 square foot area. The client’s main problem was the extremely slick surface when wet and the absorption of oils and chemicals into the concrete, leading to permanent staining and odors.
Work commenced on May 24, 2025. The first day was dedicated to extensive concrete grinding to remove all existing contaminants and prepare the surface. We focused on repairing several deep pits, some as large as 4 inches in diameter and 1 inch deep, using an epoxy repair mortar. This process took approximately 8 hours. On May 25, 2025, we applied the epoxy primer coat, which required 20 hours to cure. The next day, May 26, 2025, we applied the first colored epoxy body coat in a light gray and immediately broadcast the quartz aggregate. This took about 6 hours. After allowing 16 hours for curing, on May 27, 2025, we vacuumed excess quartz and applied two clear topcoats of chemical-resistant, high-gloss epoxy. Each topcoat application took about 4 hours, with a 6-hour re-coat interval. The total project duration was 4 days. The workshop was ready for light foot traffic after 24 hours and heavy vehicle traffic after 5 days.
The owner was highly impressed: “Epoxy Floor Wichita transformed my shop! It’s no longer a slip hazard, and spills wipe right up. My customers even comment on how clean and professional the place looks now. It’s been a game-changer for our business.”
Residential Garage Enhancement in West Wichita
A homeowner in West Wichita, residing near the Sedgwick County Zoo on Zoo Boulevard, contacted us on May 28, 2025. They had a newly constructed home with an unsealed concrete garage floor and wanted to protect it from future stains and enhance its appearance before moving in. Their three-car garage measured 30 feet by 24 feet, totaling 720 square feet.
We proposed a metallic epoxy system to give their garage a unique, high-end, and custom look. On May 30, 2025, we conducted the on-site visit and measurements. The client’s primary concern was proactive protection and achieving a premium aesthetic.
Our work began on June 2, 2025. The initial day involved diamond grinding the new concrete to ensure proper adhesion and address any minor imperfections. This took about 7 hours. On June 3, 2025, we applied an epoxy primer coat, allowing it to cure for 18 hours. The next day, June 4, 2025, was dedicated to applying the metallic epoxy base coat in a vibrant silver and black swirl pattern, which required careful artistic application and took approximately 9 hours. This unique finish was allowed to cure for 24 hours. Finally, on June 5, 2025, we applied two layers of a durable, scratch-resistant polyaspartic topcoat for added protection and gloss. Each coat took about 3 hours to apply, with a 5-hour re-coat time. The entire project was completed in 4 days. The client was able to walk on the floor after 24 hours and move vehicles in after 72 hours.
The homeowner expressed their satisfaction: “Epoxy Floor Wichita created a masterpiece in our garage! It’s absolutely stunning and has truly elevated the look of our entire home. The team was professional and meticulous.”
Industrial Warehouse Bay in North Wichita
On June 5, 2025, we received an inquiry from a logistics company in North Wichita, near K-96 and Greenwich Road. They needed a highly durable and chemical-resistant flooring solution for a 3,000 square foot loading bay that experienced constant forklift traffic and occasional chemical spills. The existing concrete was uneven and showed signs of significant wear and tear.
We recommended a heavy-duty, high-build epoxy coating system with an anti-slip aggregate. We visited the site on June 7, 2025, to assess the floor and take precise measurements. The primary problem was the rapid deterioration of the concrete under constant industrial use, leading to safety concerns and difficulty in maintaining cleanliness.
Work commenced on June 10, 2025. The first day was spent on aggressive shot blasting of the concrete to prepare the surface for maximum adhesion and repair numerous large cracks and spalls, some up to 6 inches long and 1 inch deep, using specialized industrial-grade epoxy fillers. This intensive preparation took approximately 10 hours. On June 11, 2025, we applied a thick epoxy primer coat, which cured for 22 hours. The next day, June 12, 2025, we applied the first colored epoxy body coat in a safety yellow, broadcasting fine anti-slip aggregate into it. This application took about 8 hours. After curing for 24 hours, on June 13, 2025, we applied a second, equally thick epoxy topcoat to encapsulate the aggregate and provide additional wear resistance. This final coat took approximately 7 hours. The entire project was completed in 4 days. The loading bay was accessible for light foot traffic after 48 hours and ready for full forklift traffic after 7 days.
The operations manager stated, “Epoxy Floor Wichita delivered exactly what we needed. Our loading bay is now incredibly resilient and much safer. The floor can clearly handle the heavy abuse, and it’s much easier to keep clean.”
Residential Home Gym in Northwest Wichita
A fitness enthusiast in Northwest Wichita, whose home is situated close to the Eisenhower National Airport, contacted us on June 8, 2025. They wanted to convert a section of their basement into a dedicated home gym and required a durable, impact-resistant, and aesthetically pleasing floor that could withstand heavy weights and exercise equipment. The area designated for the gym measured 15 feet by 20 feet, totaling 300 square feet.
We suggested a solid color epoxy system with a durable clear coat, providing both functionality and a clean, modern look. On June 10, 2025, we performed the on-site consultation and measurements. The client’s main concern was protecting the underlying concrete from potential damage from dropped weights and ensuring a clean, inviting workout space.
Our team began work on June 16, 2025. The first day involved diamond grinding the concrete to prepare the surface and addressing a few minor existing stains, which took approximately 5 hours. On June 17, 2025, we applied the epoxy primer coat, allowing 16 hours for curing. The next day, June 18, 2025, we applied the main body coat in a vibrant blue color, which took about 4 hours. This was followed by a 20-hour cure time. Finally, on June 19, 2025, we applied two coats of a high-abrasion resistance clear polyaspartic topcoat for maximum durability and a glossy finish. Each topcoat application took about 2 hours, with a 4-hour re-coat period. The total project was completed in 4 days. The client was able to set up their gym equipment after 48 hours.
The client was delighted, saying, “My new home gym floor is perfect! It looks fantastic and feels incredibly sturdy. Epoxy Floor Wichita was efficient and professional, and I’m confident this floor will last for years.”